Request for Proposal – Taxiway Alpha Connector

April 13, 2023
VERMILION REGIONAL AIRPORT REQUEST FOR PROPOSAL
Project name: TAXIWAY ALPHA CONNECTOR
PROPOSAL DUE DATE: MAY 1, 2023
REQUIRED DATE OF COMPLETION: AUGUST 31, 2023
PROPOSAL SUBMITTAL VIA EMAIL TO: manager@vrairport.com


COMPLETED PROJECT DESCRIPTION:

a. A connector from the new Taxiway Alpha to the original Taxiway Alpha located South of the Alpha 1 intersection with runway 21.
b. This is a temporary surface that is to be built to the IDOT Highway spec NOT required to be FAA Taxiway spec.
c. Funding is Budgeted and payments made by Vermilion Regional Airport Authority

SCOPE OF WORK TASKS:

a. Grading, fill, aggregate and surface construction of a temporary connector between the new Taxiway Alpha and the original taxiway Alpha.
b. Construction is to be per the attached drawings
c. Material estimation and design provided by the attached documentation from CMT Engineers of Springfield, IL.

The attached drawing is representative of the work description. A site visit is required to ensure the details of the work.

The materials estimate is provided by CMT Engineers of Springfield, IL.

Item Number Item Description Unit Quantity
AR108158 1/C #8 5kv UG Cable in UD Linear Foot 600
AR108706 1/C #6 Counterpoise Linear Foot 600
AR125410 MITL – Stake Mounted Each 10
AR209607 Crushed Aggregate Base Course Square Yard 800
AR401610 Bituminous Surface Course Ton 92
AR403610 Bituminous Base Course Ton 230

This surface specification is consistent with the IDOT Highway specification and NOT required to meet the FAA Taxiway specifications of A/C 150 as this is a temporary surface. IDOT Aeronautics has approved this specification.

All Vermilion County contracting and procurement requirements must be understood and contractor in compliance.

Contact Rod Hightower, Interim Airport Manager at 314-346-4807 to schedule your site visit prior to April 27, 2023.

Share this post!
Facebook
Twitter
LinkedIn