RFP No. KDNV-230710
Project name: AIRFIELD PAVEMENT CRACK REPAIR
PROPOSAL DUE DATE: July 17, 2023 by 4:30PM
PROPOSAL SUBMITTAL VIA EMAIL TO: manager@vrairport.com
SCOPE OF WORK:
BASE BID:
1. Repair all Airfield Pavement Cracks within the areas specified below in section ASPHALT
PAVEMENT SURFACES TO REPAIR (Airfield Drawing APPENDIX – C) in compliance with
FAA Advisory Circular 150/5380-6c (Attached APPENDIX – A)
2. Sealing shall be “hot pour” to FAA P-605 ASTM D6690 standard (Attached APPENDIX – B)
3. Route all qualified pavement surface cracks of 1/4 inch or greater per AC 150/5380-6C
4. All Runway & Taxiway Crack Repairs shall comply with AC 150/5370-10H shape profiles
and match the sealant product requirements.
5. Wire Brush clean and clear all qualified surface cracks previously not routed
6. Fill and repair as necessary including backer where required
7. Seal with melted pot method of Rubber compound to FAA AC 150/5380-6C
8. Vacuum clean and clear all debris AFTER routing/brushing crack and PRIOR to Sealant
application.
9. Vacuum clean and clear all debris PRIOR to opening runway, taxiway and apron areas
Contact Tess Cook, Airport Manager at (859) 221-6827 to schedule your site visit prior July 17, 2023.