Project begins April 6 through August 3, 2023
- Construction is underway and Taxiway Alpha is closed North of the Turf Runway
- Aircraft Landing on RWY 03 may be required to back-taxi for exit at Alpha 3 connector
- The remainder of the Airport will remain open